I made up the new side rails in my usual manner using mild steel rectangular tubing. This has worked very well for me on the UDB, taken a lot of punishment and not been a problem.
Pic in my local workshop were I put it together
I made up the new side rails in my usual manner using mild steel rectangular tubing. This has worked very well for me on the UDB, taken a lot of punishment and not been a problem.
Pic in my local workshop were I put it together
This entry was posted on Saturday, January 7th, 2012 at 12:28 pm. It is filed under . You can follow any responses to this entry through the RSS 2.0 feed. Responses are currently closed, but you can trackback from your own site.
Comments are closed.
Modularity theme by Graph Paper Press
Subscribe to entries
Subscribe to comments
All content © 2024 by https://www.popeyethewelder.com